Wildcat Drafting

Wheeler High School

  • Increase font size
  • Default font size
  • Decrease font size
Home Assignments Architecture 2 ARCH2 Section 3.3

ARCH2 Section 3.3

E-mail Print PDF

Plumbing Plan

[STANDARD ACT-ADDI-2: Student will prepare residential floor plans.]

Draw a plumbing plan for your model home

ESSENTIAL QUESTION: Why is it important to understand what the different plumbing symbols stand for?

Assignment

Include fixtures, piping, and other required plumbing features

Place all items on correct layers

  • P-DOMW  -  Domestic Water
  • P-DOMW-CPIP  - Cold Water Piping
  • P-DOMW-HPIP - Hot Water Piping
  • P-FIXT - Plumbing Fixtures
  • P-SANR  - Sanitary DWV Piping

Calculate the proper size piping for your model home.
Check the line thickness and color for each linetype. Make sure there is enough contrast between lines to make the plumbing lines easily visible
Include a fixture schedule and a symbols legend
Sheet number should be

  • P1.01 1st floor Plumbing plan
  • P1.02 2nd floor Plumbing plan
  • P2.01 Schedules, legend and tables (if needed)

Plot at 1/4"=1'0" scale on a "C" size sheet.
Days to complete: 5
(Points: 100)

Fixture Schedule


This schedule is to contain the following:

  • Location (room name)
  • Item (include size)
  • Manufacturer
  • Model Number (include color)
  • Faucet manufacturer, model number & finish
  • Additonal information

Legend

See page 377 for a sample plumbing legend. The legend should contain the following:

  • 3" long sample of line-type
  • Abbreviation for each linetype used
  • Description of each linetype used

Rubric

 

 

7 or more

errors

3-5 errors

No errors

Rating

Quality of Workmanship

 

 

 

35

Accuracy (All lines are in correct location and parts are sized properly)

1

3

5

 

Line weight (thickness)

1

3

5

 

Line type (pattern)

1

3

5

 

Text size

1

3

5

 

Text location

1

3

5

 

Title block information (all title information is complete)

1

3

5

 

Scale & centering (drawing is proper scale and centered in sheet)

1

3

5

 

Building Code Violations

-10

-5

0

 

 

 

 

 

 

Assignment Specific Items

 

 

55

Fixtures – Proper location

1

3

5

 

  • Correct Symbol

1

3

5

 

  • Correct Abbreviation where needed

1

3

5

 

Piping – Proper Location

1

3

5

 

  • Correct Symbol

1

3

5

 

  • Correct Pipe Size

1

3

5

 

Fixture Schedule

1

5

10

 

Legend

1

5

10

 

General Notes included

1

3

5

 

Total Score

 

 

 

 

Last Updated on Saturday, 25 December 2010 18:16